GI
GridIntake

Large-load interconnection intake, screening, and study tracking.

Purpose-built for electric cooperatives and municipal utilities facing the data-center flood. Structured intake, defensible seriousness scoring, and a duplicate-detection network that gets stronger with every member.

41
utilities in the network
11
duplicate clusters caught YTD
9.9 GW
requests under screening
Demo environment
Pick a persona to explore the walkthrough. No credentials required.
OR
View the developer-facing intake portal →
apply.gridintake.com/piedmont-emc